Water
:
WasteWater:
-
The entire city has been covered with drainage
along 490 km and serviced by (4) lift plants and main lines to
reach the treatment plant at Haikesteb which is powered by 27
thousand m 3 / day.
-
Treatment plant at Haikesteb is being extended to
accommodate the consumption of the city ( 60 thousand m 3 / day)
as a first stage of the total capacity of the plant( 200 thousand
m 3 / day).
-
Green areas irrigation network has been
implemented.
Total
water & sanitary drainage investments = LE 871 million.
Electricity :
-
The main transformer station of the city has been
established with the ability of 100 meters. and 66/22 K/V.
-
Medium and low voltage cables Networks have been
extended to the districts of the city at a total length of 2370
km.
Total
investments : LE 391 million
Roads &
Communications:
-
Alshrouk telephone Centers(1) , (2) have been
implemented and operated with a total capacity of 160 thousand
lines.
-
The of main and branch network of telephones has
been implemented with the length of 505 km .
-
The total length of impemented roads is 400 km
(from 18-100m wide) .
Total
investments: LE 0.5 million |