Water
:
Waste Water :
-
Construction of two oxidization
ponds (45 thousand M3/d ).
-
Preparation of a mechanical treatment plant (discharge of 10
thousand
M3/d )
-
20
thousand m 3 / day bilateral treatment and 20
thousand m 3 / day
trilogy treatment will be implemented.
-
Total length of finished networks : 550 Km.
Total potable water & sanitary drainage investments = LE 621 M
Electricity :
Total
investments = LE 391 M
Roads &
Communications:
-
The city has 3 main entrances :
industrial- residential- regional.
-
Construction of main telephone
center with the capacity of 40 thousand lines expected to reach 60
thousand lines.
-
Total length of Road networks :
361 Km
-
Total length of communication
networks: 586 Km.
-
Alsadat Menouf railway station
with the length of 38 Km. is being implemented.
Total investment = LE 388 M. |
| |