Water  :

  • 2 purification plants  with total capacity of 570 thousand m 3 / day  , plant wells with the capacity of 20 thousand m 3 / day .

  • water systems have been implemented along the 1161 km .

  • water purification station capacity of 600 thousand m 3 / day is under construction .

 WasteWater

  • 2 aerated oxidization ponds,190 thousand  M3/d has been constructed

  • 3 non aerated ponds , 100 thousand m3/day with a total surface of 120 feddans to serve heavy industries area 

  • Completion of mechanical treatment plant,190 thousand m3/d

  • Completion of an oxidation pond with total capacity of 60 thousand m3/day

  • Completion of  networks (719. Km) .

  • The expansion of the mechanical treatment plant and the addition of bilateral, trilateral and wastewater industrial treatment plant 600 million pounds

Electricity :

  • Completion of   Electricity networks have been implemented along 5889 km

  • Completion of  9 power plants has been implemented with total capacity  of 840.

Roads & Communications:

  • The implementation of the domestic and regional routes networks with total length of 1300 km ,  2 a concrete overpass has been established on the Cairo-Ismailia at the entrance of the city at km 51.56 .

  • The establishment of a bridge on Ismailia Canal in Belbis

  • A Communication Center was created mainly to serve the first and the second phase with capacity of 150 thousand lines and can be increased a ground network  was implemented with capacity of  86 thousand line to serve the first and second phases.

  • A Communication Center with total capacity of 5000 lines to serve heavy  industry area .

  • 3 plots has been allocated for new communication centers with total capacity of 200 thousand lines .

  • Under construction : a communication network for “build your own House” and national housing with total capacity of 76 thousand lines at the following neighborhoods : 10, 12,14,

  • Completion of  the total number of communication networks  687 km . 

Total investment in water and wastewater , Electricity , Roads and Communication LE 7 billion .