Water :

  • The city is fed with potable water through water purification plantplant (3 stages ) with total capacity of  660 thousand m 3 / day , the fourth stage is currently under implementation so that the total capcity will reach 1.2 million m3/day 

  • In addition to the implementation of the socket and the Uploader and treatment plant capacity of 400 thousand m 3 / day .

  • 97 km major networks were implemented  (diameters of 400 mm to 1400 mm) 645 km sub-networks (diameters from 100 mm to 300 mm) .

 WasteWater:

  • Implementation  of 4 pumping stations and disposal lines for the transfer of the actions to the city treatment plant, at Al Gabal Al Assfar wastewater  

  • Networks have been implemented along the 642 km .

Electricity  :

  • The implementation of a number (3) electricity  stations  have been implemented capacity  of 300 MVA .

  • Electricity networks have been implemented along the 4906 km with a total cost of LE 678 million .

Roads and Communication:

  • The implementation of a number (2) permanent communication Centers  and (1) temporary implementation of a communications

  • network along the 832 km capacity of  180 thousand line

  • The implementation of road networks along the 866 km

  • Under implementation telecommunications network capacity of 60 thousand lines

  • Under implementation Al Obour communication center (4)

total investments of LE 2.5 billion for the infrastructure