Water
:
• The city is
provided with 500 mm water main from Marruit water plants ( 5000
M3/d)
. • Total Length of finished networks ( 128.4 Km).
Sanitary Drainage:
•
Constriction of 6.8 thousand M3/d compact treatment plant.
• Design
of the second phase (15000 M3/d )
• Total length of networks , 55
Km.
• Total PW & SD investments = LE118.4 M
Electricity :
*
Total length of finished networks : 313 Km. *Total investments =
LE 49.6 M
Roads &
Communications:
Total
length of finished Road networks 53 Km Total length of
communication networks : 35 Km Total investment ; LE 36.9 M.
|