Water :

      The city is provided with well water treatment plant (10000 M3/d ).

     Construction works of the surface plant of permanent water (1st phase)50000 M3/d 9 total of 100 thousand M3/d).

     Total Length of finished networks ( 156.5 Km).

Sanitary Drainage:

    Completion of an oxidization pond (9.6 thousand M3/d ) .

     Tendering for permanent treatment plant ( 1st phase) (50000 M3/d)of the total : 100000 M3/d) .

     Total length of finished networks , 110 Km. 

      Total potable water & sanitary drainage ( PW&SD)

Investments = LE 260.9 M < /P >

Electricity:

     length of finished networks : 690 Km.

Total investments = LE 177.6 M

Roads &Communications :

     Total length of finished Road networks :120 Km Total length of communication networks : 94 Km

Total investment ; LE 123.9 M.