Water :
The city is provided with well water treatment plant (10000 M3/d ).
Construction works of the
surface plant of permanent water (1st phase)50000 M3/d 9 total of
100 thousand M3/d).
Total Length of finished
networks ( 156.5 Km).
Sanitary
Drainage:
Completion
of an oxidization pond (9.6 thousand M3/d ) .
Tendering for permanent
treatment plant ( 1st phase) (50000 M3/d)of the total : 100000 M3/d)
.
Total length of finished
networks , 110 Km.
Total potable
water & sanitary drainage ( PW&SD)
Investments = LE 260.9 M <
/P
>
Electricity:
length of finished networks : 690 Km.
Total investments = LE 177.6 M
Roads
&Communications :
Total length of finished Road networks :120 Km Total length of
communication networks : 94 Km
Total investment ; LE 123.9 M. |