Contact Us
Allocation & License Application



 

  






Utilities

Water  :

  • The main pumping plant ( capacity of 75 thousand m 3 / day) with a land tank (capacity of 10000 m 3) .

  • One  tank of high-capacity (5000 m 3) and two extension tanks ( 1000 m 3) .

  • The main water line ( 1000 mm) along 13 km .

 WasteWater :

  • Completion of SD treatment plant (30000 M3/d ).

  • Completion of over discharge sewage(70000 M3/d )

  • Total length of networks 167 Km.

  • Expulsion line (13.4 length) from the treatment plant to Alsaf drainage.

Electricity :

  • Total length of finished networks : 1527 Km.

  • Main  power station capacity of (75 MB. P. a).

  • Youth workshops electricity network  - the second industrial zone.

  • Completion of electricity network   of  the 4 th district – Extension zone

Roads & Communications:

  • City communication Centre (30 thousand lines) 0

  • Roads networks (144 km long) and ( 20-40 meters wide ) .

  • Forming the roads of the  family housing and the city center along 11 km .

  • Industrial works for the prevention of Flash Floods .

  • Total length of communication networks 443 Km .                             

Infrastrcuture Total investments = LE 80 million 

News