|
Contact Us
Allocation & License Application
|
 |





 |
|
Water
:
-
The
main pumping plant ( capacity of 75 thousand m 3 /
day) with a land tank (capacity of 10000 m 3) .
-
One tank of high-capacity (5000 m 3) and two
extension tanks ( 1000 m 3) .
-
The main water line ( 1000 mm) along 13 km .
WasteWater
:
-
Completion of
SD treatment plant (30000 M3/d ).
-
Completion of over discharge sewage(70000 M3/d )
-
Total length of networks 167 Km.
-
Expulsion line (13.4 length) from the treatment
plant to Alsaf drainage.
Electricity :
-
Total length of finished networks : 1527 Km.
-
Main
power
station
capacity of
(75
MB.
P.
a).
-
Youth
workshops electricity network
-
the
second industrial
zone.
-
Completion of
electricity network
of
the 4 th district –
Extension
zone
Roads &
Communications:
-
City
communication Centre (30 thousand lines) 0
-
Roads
networks (144 km long) and ( 20-40 meters wide ) .
-
Forming
the roads of the family housing and the city center along 11 km .
-
Industrial works for the prevention of Flash Floods .
-
Total length of communication networks 443 Km
.
Infrastrcuture Total investments = LE 80 million |
| |