Water
:
-
The
water plant 1000 / s has been implemented and water lines to the
city at a length of 9.6 km and 1000 / 900 mm diameter . the
extension of water pipeline , water plant ( 1000 mm) and the
Ground water tank with the capacity of 8000 m 3 are being
implemented.
-
Water systems within the city ( 441 km
length ).-
The irrigation of green areas from
impure water plant has been implemented
WasteWater
:
he entire city has been covered with sewage network (length
of 370)served by (16) pumping stations and lines of the
expulsion .
Introducing a second phase with the capacity of 50 thousand m 3
/ day is being studied.
Water and sanitation total investments are 930 million
pounds
Electricity :
-
The main transformer station of the
city has been set up with the capacity of 50M.F.A and the power
of 66/11 K.F for continous and constant feeding of the city .
-
Medium voltage cable Networks have
been extended and the streets of the city districts have been lit
(total length is 1730 Km) .
Electricity total investments are 400 million pounds
Roads &
Communications :
The
total length of the implemented roads is 320 m / l (13-68 m width) .
Total investments= 380 million pounds
|
| |