Utilities

Water :

  • The water plant 1000 / s has been implemented and water lines to the city at  a length of 9.6 km and 1000 / 900 mm diameter . the extension of water pipeline , water plant ( 1000 mm) and the Ground water tank  with the capacity of 8000 m 3 are being implemented.

  • Water systems within the city ( 441 km length ).

  • The irrigation of green areas from impure water plant has been implemented

WasteWater :

  • The entire city  has been covered with sewage network (length of 370)served by (16) pumping stations and lines of the expulsion .

  • Introducing a second phase  with the capacity of 50 thousand m 3 / day is being studied.

Water and sanitation total    investments are 930 million pounds

Electricity :

  • The main transformer station of the city has been set up with the capacity of  50M.F.A  and the power of 66/11 K.F for continous and constant feeding of the city .

  • Medium voltage cable Networks have been extended and the streets of the  city districts have been lit (total length is 1730 Km) .

     Electricity total    investments  are 400 million pounds

Roads & Communications :

  • The City telephone Centre has been implemented with the capacity of 20 thousand lines.

  • The main and branch telephone network has been implemented(333 km length). 

  • The total length of the implemented roads is 320 m / l (13-68 m width) .

    Total investments= 380 million pounds