Water :

  • The city is fed with water from Mariot canal feeding from  Nubariya canal.

  • Purification water plant has been constructed ,so the total allocated water to the city is 166 thousand m 3 / day as a first and second stages.

  • Implementation of the top water tank (Capacity  of 2000 m 3) and ground tanks (Capacity  of 13000m3) under it.                               

  • Implementation of ground tanks  at Alrafaa Plant (Capacity  of 12 000 m).

WasteWater :

  • Implementation of sewage pipes networks with the total length of 562 km.

  • Establishment of sewage treatment plant with a capacity of 36 thousand m 3, and being upgraded to up to 100 thousand m 3.

  • Establishment of expulsion pipelines and pumping plant s for the first district and industrial areas with the total length of 29.97 km .

  • Implementation of the rest of the sewage networks of the seventh district and the second phase of the second and third districts   are running with the total length of 27.5 km.

  • Implementation of the tri-treatment plant (first phase) is running with the capacity of 115 thousand m 3.

Electricity :

  • Establishment of networks ( 1425 km), electrical cables ,  16 electricity distributors and 267 electrical converter stalls.

  • Establishment of city entrance lighting network ( electrical cables with total length of 19.1 km and 6 converter stalls) .

Roads & Communications :

  • Total length of road networks is 560 Km. 

  • Total length of road communication networks is 320 Km.

Utilities Total investments : LE 1.2 Billion.